Accessories for universal shaker SM 30

Accessories for universal shaker SM 30
Accessories for universal shaker SM 30Accessories for universal shaker SM 30    
Combifix SM A attachment: Flexible attachment with 5 clamping bars for various containers with flat bases.

Combifix SM B attachment: With 4 clamping bars for holding horizontal or tall containers securely.

Combifix SM C attachment: For separating funnels.

Universal tray SM: For flexible fitting with accessory spring clips or test tube stands.

Sliding Plates: Sliding plates with Combifix SM (rack systems Combifix SM, but with additional base plate).

Mounting set: for universal trays, or sliding plates on the 2-storey top frame SM.

SM attachment, 2-storey support: With 2 boards for spring clips (please order separately) or for mounting Combifix SM attachments.

2-storey top frame SM / TH: 2-storey top frame for all SM shakers. Dimensions adapted to TH 30. For vessels with a max. height of 14 cm (Erlenmeyer flasks 200 / 250 ml). Dimensions (w x d x h): 600 x 402 x 192 mm. For fastening the vessels, either universal trays SM or sliding plates with Combifix SM can be used.
TypeRack system Combifix SM, Set A
PK1
Cat. No.06243764
Lieferzeit ca. 10 Arbeitstage
TypeRack system Combifix SM, Set B
PK1
Cat. No.06243760
Lieferzeit ca. 10 Arbeitstage
TypeRack system Combifix SM, Set C
PK1
Cat. No.06243757
Lieferzeit ca. 10 Arbeitstage
TypeUniversal tray SM (without spring clamps)
PK1
Cat. No.06243755
Lieferzeit ca. 10 Arbeitstage
TypeSliding plate for top frame with Combifix SM, Set A
PK1
Cat. No.09850389
Lieferzeit ca. 10 Arbeitstage
TypeSliding plate for top frame with Combifix SM, Set B
PK1
Cat. No.09796775
-
TypeSliding plate for top frame with Combifix SM, Set C
PK1
Cat. No.09796774
-
TypeMounting set for universal trays or sliding plates
PK1
Cat. No.09826727
Lieferzeit ca. 10 Arbeitstage
Type2-storey top frame SM (without platforms)
PK1
Cat. No.06243754
Lieferzeit ca. 10 Arbeitstage
Type2-storey top fram SM/TH (for using SM with TH)
PK1
Cat. No.09571393
Lieferzeit ca. 10 Arbeitstage